Sunday 04 Aug 2024 |
AFED2022
 
AFEDAnnualReports
Environment and development AL-BIA WAL-TANMIA Leading Arabic Environment Magazine

 
News Details
 
World’s largest floating wind farm set for construction off Scottish coast 17/5/2016
Construction on the world’s largest floating wind farm is set to begin this year off the coast of Scotland after developers were granted a lease on Monday.
 
Five turbines will operate in waters around 12 to 18 miles off the coast of Peterhead, Aberdeenshire as part of the Hywind project.
 
The project, which will have a total capacity of 30 megawatts, will begin later this year, with turbines erected in 2017 and the first power generated at the end of next year.
 
The Hywind Scotland Park was given consent from Marine Scotland in October, but before being given the go-ahead, the Crown Estate that manages leasing of the seabed and energy company Statoil had to meet planning, finance and legal requirements.
 
Rather than using fixed foundations on the seabed, the project will use a floating steel tube tethered to the seabed as a foundation for the turbines.
 
Offshore wind is a key part of Europe’s target to source 20 per cent of final energy consumption from renewables.
 
More than 91 per cent of the world’s offshore wind power is currently installed off northern Europe, in the North, Baltic and Irish Seas, and the English Channel.
 
Presently, offshore wind makes up just three per cent of the global installed capacity, however governments outside of Europe have also set ambitious targets for offshore wind and development is set to get underway in China, Japan, South Korea, Taiwan and the US. Other markets such as India and Brazil have also expressed interest in offshore development.
 
"We are very pleased to develop this project in Scotland, in a region with a huge wind resource and an experienced supply chain from oil and gas,” said Project Director Leif Delp. “Through the hard work of industry and supportive government policies, the UK and Scotland is taking a position at the forefront of developing offshore wind as a competitive new energy source.” (Independent)
 
 
PHOTO: The project will begin later this year, with turbines erected in 2017 and the first power generated at the end of next year.
CREDIT: Alan O Neill - Statoil ASA.
 
 
 
 
 
Post your Comment
*Full Name
*Comments
CAPTCHA IMAGE
*Security Code
 
 
Ask An Expert
Boghos Ghougassian
Composting
Videos
 
Recent Publications
Arab Environment 9: Sustainable Development in a Changing Arab Climate
 
ان جميع مقالات ونصوص "البيئة والتنمية" تخضع لرخصة الحقوق الفكرية الخاصة بـ "المنشورات التقنية". يتوجب نسب المقال الى "البيئة والتنمية" . يحظر استخدام النصوص لأية غايات تجارية . يُحظر القيام بأي تعديل أو تحوير أو تغيير في النص الأصلي. لمزيد من المعلومات عن حقوق النشر يرجى الاتصال بادارة المجلة
© All rights reserved, Al-Bia Wal-Tanmia and Technical Publications. Proper reference should appear with any contents used or quoted. No parts of the contents may be reproduced in any form by any electronic or mechanical means without permission. Use for commercial purposes should be licensed.