Thursday 08 Aug 2024 |
AFED2022
 
AFEDAnnualReports
Environment and development AL-BIA WAL-TANMIA Leading Arabic Environment Magazine

 
News Details
 
Suez Canal Reopens to Fanfare but Not Shared by All 4/8/2015
Ships at sea around the world will blast their horns on Aug 6 to mark the re-opening of the world-famous centenarian waterway in Egypt, local officials there say.

"Food will arrive faster. Medicine will arrive faster. Petroleum products will arrive faster," proclaimed Suez Canal Authority head Admiral Mohab Mohamed Hussein Mameesh."Egypt is serving the whole the world by speeding up this naval passage'.

The "new canal" – constructed parallel to the existing one - will allow ships to pass by each other, like a two-lane highway, as opposed to a single lane. Upon completion, more ships will fit inside the canal at the same time, reducing the wait time for some ships from 22 hours to 11 hours.

"Ships manufactured today are enormous," said Mameesh. "Our current capacity is just eight ships per day. If there are nine ships, one has to wait outside the canal." With the expansion, the Canal Authority expects to capture over 13 billion dollars a year in toll fees by 2023, or more than 5 billion dollars over what the canal now earns.

But critics of the refurbished canal see it as an attempt by Egyptian President Abdel Fattah Al Sisi to shore up support for his government amid continuing economic problems in Egypt.Others have suggested Suez Canal may not need an upgrade.

For the surrounding area, development of an industrial hub along a 160 km corridor of barren desert beside the waterway been awarded to the Bahrain-registered consultancy Dar Al-Handasah, which called the canal "one of the greatest feats of modern engineering and one of the world most vital channels for global trade'.

A World Bank country director confirmed that the Bank is participating in the project in an advisory capacity saying it would "change the economic landscape of Egypt and create sustainable job opportunities for brilliant and energetic Egyptian youth."
The original 101 mile-long canal, which connects Europe and Asia, took ten years to build in the 1860s at great human and financial cost.

Photo: Southern exit of the Suez Canal, Port Suez
 
 
 
 
 
 
Post your Comment
*Full Name
*Comments
CAPTCHA IMAGE
*Security Code
 
 
Ask An Expert
Boghos Ghougassian
Composting
Videos
 
Recent Publications
Arab Environment 9: Sustainable Development in a Changing Arab Climate
 
ان جميع مقالات ونصوص "البيئة والتنمية" تخضع لرخصة الحقوق الفكرية الخاصة بـ "المنشورات التقنية". يتوجب نسب المقال الى "البيئة والتنمية" . يحظر استخدام النصوص لأية غايات تجارية . يُحظر القيام بأي تعديل أو تحوير أو تغيير في النص الأصلي. لمزيد من المعلومات عن حقوق النشر يرجى الاتصال بادارة المجلة
© All rights reserved, Al-Bia Wal-Tanmia and Technical Publications. Proper reference should appear with any contents used or quoted. No parts of the contents may be reproduced in any form by any electronic or mechanical means without permission. Use for commercial purposes should be licensed.